BM3 DGH Installation Manual 641058a


⚠️ Safety Notice – Gas Ducted Heaters (Installation)

This appliance must only be installed and commissioned by suitably qualified and licensed personnel.

Before commencing work, ensure a risk assessment has been completed and that safe access, service clearances, electrical supply requirements, gas installation requirements and ventilation provisions have been considered. Installation must comply with all applicable regulations, standards and manufacturer requirements.

Do not proceed with the installation if safe access, required clearances or compliance requirements cannot be achieved.


Safety takes priority over diagnosis, installation timeframes and customer expectations. If the task cannot be completed safely, it must not proceed until the risks have been adequately controlled.


Pdf attached,