Installation / Commissioning Information

Refrigeration Installation

KDHV ducted single phase - 3rd party controls (AirTouch MyAir and iZone) communication for ducted inverter
KDHV ducted single phase - 3rd party controls (AirTouch MyAir and iZone) communication for ducted inverter
Tue, 30 May, 2023 at 2:48 PM
Zone Control RF remote interface dip switch settings Installation Manual - Braemar - Zone Control - LE60-13GH02-E
Zone Control RF remote interface dip switch settings Installation Manual - Braemar - Zone Control - LE60-13GH02-E Installation manual attached ...
Mon, 28 Apr, 2025 at 10:06 AM
SCHV - SDHV ducted refrigerated XK60 controller service parameters
SCHV - SDHV ducted refrigerated XK60 controller service parameters Attached documents:  SCHV controller parameter XK60 single phase Pdf ...
Tue, 2 Jan, 2024 at 9:53 AM
SDHV ( XK60, XK117, XK75 ) and KDHV ( XE71, XK75 ) connecting to Airtouch and other 3rd Party zone controls
SDHV ( XK60, XK117, XK75 ) and KDHV ( XE71, XK75 ) connecting to Airtouch and other 3rd Party zone controls 
Fri, 19 Nov, 2021 at 2:16 PM
WSHV-T Wall Split - Connecting optional wired controller XK76
WSHV-T Wall Split - Connecting optional wired controller XK76
Wed, 1 May, 2024 at 8:51 AM
SDHV ducted three phase - 3rd party controls (AirTouch MyAir and iZone) communication for ducted inverter
SDHV ducted three phase - 3rd party controls (AirTouch MyAir and iZone) communication for ducted inverter
Tue, 30 May, 2023 at 2:48 PM
Braemar KDHV ducted reverse cycle changing address settings to suit 3rd party Air Touch controller using supplied XE71 controller supplied
Braemar KDHV ducted reverse cycle changing address settings to suit 3rd party Air Touch controller using supplied XE71 controller supplied As per page 2...
Fri, 27 Jan, 2023 at 12:09 PM
KDHA - R32 ducted single phase split - 3rd party control (AirTouch) installation
KDHA - R32 ducted single phase split - 3rd party control (AirTouch) installation *For airtouch 4, S2 settings are 0110 The XE7C/HC wall control stays ...
Mon, 28 Apr, 2025 at 10:30 AM
SCHV20-24D3S Commissioning / debugging process
Commissioning / debugging process of a SCHV20-24D3S Apply 3 phase power to the outdoor unit for a minimum of 1 hour prior to commencing the commission...
Thu, 27 Feb, 2020 at 2:40 PM
XE71 SDHV and KDHV System Parameter Settings
XE71 SDHV and KDHV System Parameter Settings  Pdf attached,
Thu, 6 Jul, 2023 at 10:15 AM